The project is located in Shenyang Jinlang North area. It includes two residential buildings, one Soho, one office building and a large scale podium. Shenyang China has extremely cold tempuratures in the winter months and extremely hot temperatures in the Summer. Therefore, KWP designed a high performance unitized system with thermally broken extrusions. The podium consists of a complex combination of several facade materials; glass, stone, terracotta, aluminum panel and fiber plastic. The entire podium is covered with a long span steel structure skylight system. KWP realized the challenging requirement of the Architect to design a skylight long span tension rod system which is rarely used in China. KWP were appointed by the Developers for full façade consultancy, from design through project completion.
| Join Our Mailing List |